You are here


The $25.8 million New Central Residence Hall is scheduled for fall 2013 occupancy.

In all the understandable buzz about massive open online courses (MOOCs) and alternative models for delivering content, remember this: Residential campuses will continue to be critical to higher education and to preparing a competitive 21st-century workforce. Why? For starters, as MIT President L. Rafael Reif wrote recently in The Wall Street Journal, high quality online education and affordable residential campuses are intertwined.

With any campus building, what’s on the inside counts just as much—and probably more—than what’s on the outside. This is especially true with residence halls, which must include a balance of private and shared spaces. “The buildings need to promote interaction among students to encourage peer-to-peer learning in support of the institution’s academic mission,” says Jackson Kane, an associate and housing specialist at Lord, Aeck & Sargent. That’s no small order.

The Stockton Campus  Center at Richard Stockton College of New Jersey

Prior to 2011, the sports and events facilities at the University of Mary Washington (Va.) were nothing to write home about. The university’s Dodd Auditorium had a capacity of 1,300 for concerts and other special events, and the Woodard Campus Center gymnasium, which was built in the 1950s, could only seat 500 and couldn’t be used for anything but sporting events.

DeafSpace architectural design elements aid visual communication and help reduce eye strain and fatigue for deaf and hard of hearing people. A new Living and Learning Residence Hall, dubbed LLRH6, is the second construction project  incorporating DeafSpace at Gallaudet University (D.C.).

Four-bedroom Stafford cottage model being built near The University of Mississippi

A community of 160 two- to five-bedroom cottages is under construction near The University of Mississippi campus. Partners in the $37.6-million, 4,700-bed project are EdR (majority owner and manager upon the fall 2013 completion) and Landmark Properties (handling development and construction). The community will have outdoor living areas, a pool, a sand volleyball court, horseshoe pits, and a clubhouse with a fitness center, tanning beds, an internet café, study rooms, a computer lounge, a game room, a golf simulator, and a community kitchen.

The uses for AV technologies in higher ed aren’t limited to traditional classrooms. At the University of Florida’s new three-story, 100,000 square-foot veterinary teaching hospital, an integrated AV network is woven into the fabric of the building. In this University Business web seminar, originally presented on May 22, 2012, David John, safety and security supervisor at the College of Veterinary Medicine, discussed how the hospital is using its AV network to improve patient care as well as the learning experience for students.

The lounge features a stone-clad fireplace, plush seating, ample seating areas, and a high-definition TV.

Two under-utilized spaces were transformed into highly trafficked, vibrant areas on Chestnut Hill College’s campus in Philadelphia.

Over the course of approximately 200 conversations and interviews for our book, The Sustainable University: Green Goals and New Challenges for Higher Education Leaders (Johns Hopkins, 2012), it became apparent that while many believe the period for orientations to sustainability has passed and the movement has transitioned from one of general citizen awareness to the need for tangible solutions, many

The future Science and Engineering Building 2 at UC Merced

A three-story, 103,000-square-foot laboratory and research building project got under way this spring at the University of California, Merced. Called the Science and Engineering Building 2 and designed by Smith Group JJR, it will complete the academic core around the campus quad. General contractor McCarthy Building Companies is managing the $88 million project, as well as the $10 million Recreation Center North project, a 19,000-square-foot facility designed by WRNS Studio, which recently had its final structural beam put in place.